JamBot Logo
1-100 of about 114 matches for site:aviationandaccessories.tpub.com initial contract
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
56/P Manual 4-12. Lining, Helmet, Shock (TPL) Custom-Fitting.   TM   1-8415-216-12&P INITIAL FITTING OF THE
http://aviationandaccessories.tpub.com/TM-55-4920-429-13/css/TM-55-492...
Table 2-2. Test Set Initial Switch Positions Custom Search      Figure 2-3. Test Set Connections to Helicopter TM
http://aviationandaccessories.tpub.com/TM-1-1680-359-10/css/TM-1-1680-...
2-6.  INITIAL ADJUSTMENTS, DAILY CHECKS,  AND SELF-TEST Custom Search      g. Taking Off Vest TM-1
http://aviationandaccessories.tpub.com/TM-55-1510-215-MTF/css/TM-55-15...
a Turn on procedure:  Function               K35 switch   -   TEST   (information   will   appear after time delay period). b. Initial adjustments: (1)   BRT        control
http://aviationandaccessories.tpub.com/TM-1-1510-223-CL/css/TM-1-1510-...
5. MISSION CONTROL switch – OFF. DEPARTURE BRIEFING 1. ATC clearance – Review. a.   Routing. b.   Initial altitude. 2. Departure procedure
http://aviationandaccessories.tpub.com/TM-55-1510-220-CL/css/TM-55-151...
2. Emergency equipment. 3. Emergency landing/ditching procedures. DEPARTURE BRIEFING. ATC clearance - Review. 1. Routing. 2. Initial altitude. Departure procedure - Review
http://aviationandaccessories.tpub.com/TM-55-4920-429-13/css/TM-55-492...
13 Aviation Intermediate Maintenance and Illustrated Parts Breakdown Manual Table 2-2. Test Set Initial Switch Positions   TM 55
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
AH-1  boresight  must  be adjusted  by  the  armament  technician  after  the  initial  fitting,  every 120  days
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
8415-206-12&P 3-12.  SEAL AND EAR CUP ASSEMBLY This task covers: Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
12&P 3-14.   EAR CUPS This task covers: a.  Removal c.  Installation b.  Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
CUSHION BACKING, EAR CUP ASSEMBLY This task covers: a.   Removal c.   Installation b.  Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
17. THERMO PLASTIC LINER (TPL) This task covers: a.  Removal c.  Installation b.  Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
8415-206-12&P 3-4.   VISOR HOUSING This task covers: a.  Inspection b.  Service INITIAL SETUP Materials/Parts Clean
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
AND EAR CUP ASSEMBLY   TM 10-8415-206-12&P 3-11.  BEADING This task covers: Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-55-1510-222-CL/css/TM-55-151...
and 12 o'clock - Check. DEPARTURE BRIEFING 1. ATC clearance - Review. a. Routing. b. Initial altitude. 2. Departure procedure
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
206-12&P 3-15.   PAD, SPACER, AND EAR CUP ASSEMBLY This task covers: Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
8415-206-12&P 3-6.  RETENTION ASSEMBLY This task covers: a.  Inspection b.  Adjustment INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
8415-206-12&P 3-7.  SUSPENSION ASSEMBLY This task covers: a.  Inspection b.  Adjustment INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
4-11.  VISOR This task covers: a.  Removal c.  Replacement b.  Inspection d.  Installation INITIAL SETUP Tools Screw Driver
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
12&P 3-9.  EAR CUP CROSS STRAPS This task covers: a.  Inspection b.  Adjustment INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
10.  VISOR HOUSING This task covers: a.  Inspection c.  Replacement b.  Removal d.  Installation INITIAL SETUP Tools Screw Driver
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
SPH-4B Manual 3-19.  Edge Beading   TM 1-8415-215-12&P 3-18.  Chafing Pad. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Manual 3-11.  Communications Cord   TM 1-8415-215-12&P 3-10.  Microphone/Boom/Swivel Assembly. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
be included in the table are referenced elsewhere in this manual. INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-55-1510-215-MTF/css/TM-55-15...
and   right   systems.   The   torque   and ITT should return to initial values, the PARTICLE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
10-8415-206-12&P 3-5.  VISOR This task covers: a.  Inspection b.  Service INITIAL SETUP Materials/Parts Clean
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
PLASTIC LINER (TPL)   TM 10-8415-206-12&P 3-16.  OUTER SHELL This task covers: Inspection INITIAL SETUP Tools Screwdriver, 114
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
4B Manual 3-20.  Touch-up Painting.   TM 1-8415-215-12&P 3-19.  Edge Beading. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
release switch   TM 1-5855-265-20 3-5 3-3.  MOVING PNVS TURRET ASSEMBLY MANUALLY INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-1-1510-225-MTF/css/TM-1-1510...
and   ATTITUDE flags clear. (b)  AP  FAIL  and  AP  TRIM  FAIL  - Annunciators    illuminate    upon initial   application   of   AP
http://aviationandaccessories.tpub.com/TM-55-1510-219-MTF/css/TM-55-15...
shall  sound  at  no  more  than  12,  and  no less than 4 knots above initial stall buffet. *1.  Stall
http://aviationandaccessories.tpub.com/TM-55-1510-220-MTF/css/TM-55-15...
shall sound at no more than 12, and no less than 4 knots above initial stall buffet. *1.   Stall
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
11 Manual TEST lamp lights   TM 1-5855-265-20 3-3 3-2.  PREMAINTENANCE PROCEDURES INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
s Protective Manual BEADING   TM 10-8415-206-12&P 3-10.  LINER This task covers: Inspection INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
AH-1  boresight  must  be  adjusted  by  the armament  technician  after  the  initial  fitting,  every  120  days
http://aviationandaccessories.tpub.com/TM-1-1510-225-CL/css/TM-1-1510-...
Aircraft Army C-12F3 Aircraft Manual ARRIVAL BRIEFING   TM 1-1510-225-CL P-13 b.   Initial altitude. 2.   Departure Procedure
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Manual 3-14.  Inner Visor Knob.   TM 1-8415-215-12&P 3-13.  Outer Visor Lock. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-55-1510-221-CL/css/TM-55-151...
between 9 and 12 o'clock. DEPARTURE BRIEFING ATC CLEARANCE - REVIEW 1. Routing. 2. Initial altitude. DEPARTURE PROCEDURE - REVIEW
http://aviationandaccessories.tpub.com/TM-55-1510-215-MTF/css/TM-55-15...
PROCEDURE TROUBLESHOOTING REFERENCE f. Windshield anti-ice operation - Check. The electrothermal windshield     will     prevent     initial     ice adhesion   to
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Removal of Earcup   TM 1-8415-215-12&P 3-8.   Earcups and Earphones. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Manual 3-15.  ANVIS Mount Installation.   TM 1-8415-215-12&P 3-14.  Inner Visor Knob. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-1510-225-MTF/css/TM-1-1510...
PROCEDURE TROUBLESHOOTING REFERENCE NOTE Illumination   of   the   AP   FAIL   annunciator   other than  during  initial  power-up  indicates  a
http://aviationandaccessories.tpub.com/TM-1-1510-224-CL/css/TM-1-1510-...
the microwave radiation hazard. DEPARTURE BRIEFING 1. ATC clearance - Review. a. Routing. b. Initial altitude. 2. Departure procedure
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Manual APPENDIX A REFERENCES   TM 1-8415-215-12&P 3-20.  Touch-up Painting. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
SPH-4B Manual 3-18.  Chafing Pad   TM 1-8415-215-12&P 3-17.  Cross Straps. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
GUARD LOCK ASSEMBLY This task covers: a.  Removal c.  Replacement b.  Inspection d.  Installation INITIAL SETUP Tools Screwdriver, Flat
http://aviationandaccessories.tpub.com/TM-1-1510-218-CL/css/TM-1-1510-...
and 12 o'clock. DEPARTURE BRIEFING 1.  ATC clearance – Review. a.   Routing. b.   Initial altitude. 2.  Departure procedure
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
a turret   TM 1-5855-265-20 3-9 3-4.  MOVING TADS TURRET ASSEMBLY MANUALLY INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
Flow of detergent/water solution   TM 1-5855-265-20 3-17 3-6.  CLEANING INITIAL SETUP Tools Maintenance platform
http://aviationandaccessories.tpub.com/TM-1-1680-359-10/index.htm
Leg Webbing For Freedom Of Movement G. Taking Off Vest 2-6. Initial Adjustments, Daily Checks, And
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
8415-206-12&P 3-8.  CHIN STRAP This task covers: a.  Inspection b.  Adjustment INITIAL SETUP Personnel Required ALSE
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/css/TM-10-84...
VISOR AND GUARD LOCK ASSEMBLY This task covers: a.  Inspection b.  Adjustment INITIAL SETUP Tools Screwdriver, flat
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
SPH-4B Manual 3-7.  Retention Assembly.   TM 1-8415-215-12&P 3-6.  Thermoplastic Liner. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Figure 3-4.  Retention Assembly Attachment Points   TM 1-8415-215-12&P 3-7.   Retention Assembly. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
Manual HEAVY OBJECT   TM 1-5855-265-20 3-49 3-12.  PNVS TURRET ASSEMBLY INSTALLATION INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-1-1680-359-10/css/TM-1-1680-...
1680-359-10 Aircrew Survival Armor Recovery Vest Insert and Packets Manual 2-6.  INITIAL ADJUSTMENTS, DAILY CHECKS,  AND
http://aviationandaccessories.tpub.com/TM-55-4920-429-13/css/TM-55-492...
in the test set. See fig. 2-3. (4) Check that tester switches are at initial positions as listed in
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
Manual INSTALLATION   TM 1-5855-265-20 3-28 3-9.  PNVS WINDOW COVER ASSEMBLY REPLACEMENT INITIAL SETUP Personnel Required 68X
http://aviationandaccessories.tpub.com/TM-55-1680-316-10/css/TM-55-168...
Model CH-47 Helicopter Manual 2-3. GROUND LANDING INSTRUCTIONS   TM 55-1680-316-10 (1) Initial  activation  by  gravity  drop
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Installation   TM 1-8415-215-12&P 3-5.   Energy-Absorbing Liner and Thermoplastic Liner. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
unit from a type I or III reusable shipping and storage container. INITIAL SETUP Personnel Required 68X
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
REMOVAL - TYPE I   TM 1-5855-265-20 3-30 3-10.  RIM CLENCHING CLAMP REPLACEMENT INITIAL SETUP Tools 50-lb
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
4-13. Removing and Replacing Standard Components. a. Lining, helmet, shock (EAL). INITIAL    SETUP Tools/Equipment Personnel
http://aviationandaccessories.tpub.com/TM-55-1680-316-10/css/TM-55-168...
AN/PRC-9O WARNING Set receiver to guard channel 243.0 for initial contact. Do   not   change
http://aviationandaccessories.tpub.com/TM-1-1680-359-10/css/TM-1-1680-...
a. SURVIVAL VEST AND ARMOR Custom Search      2-6.  INITIAL ADJUSTMENTS, DAILY CHECKS,  AND SELF-TEST
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Manual 3-12.  Dual Visor Assembly   TM 1-8415-215-12&P 3-12.  Dual Visor Assembly. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-1-1680-359-10
Leg Webbing For Freedom Of Movement G. Taking Off Vest 2-6. Initial Adjustments, Daily Checks, And
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
Condemned)  Tag  -  Materiel; or  DD  Form  1577-2,  Unservicable  (Repairable)  Tag  -  Materiel. 4-10.   Helmet   Sizing. INITIAL   SETUP General   Safety   Instructions
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
Install dust cap   TM 1-5855-265-20 3-39 3-11.  PNVS TURRET ASSEMBLY REMOVAL INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
M45   CB   Mask TM-1-8415-216-12P Helmet System Aircrew Integrated HGU-56/P Manual INITIAL FITTING OF THE
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
11b.   Fitting   Procedure   for   HGU-56/P   with   the   M45   CB   Mask INITIAL    SETUP Materials/Parts General
http://aviationandaccessories.tpub.com/TM-55-4920-429-13/css/TM-55-492...
specific  test  instruction,  set  the  controls  and  switches  to  their initial  positions  as  listed  in
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
4-12. Lining, Helmet, Shock (TPL) Custom-Fitting. Custom Search      INITIAL FITTING OF THE HELMET TM-1-8415
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
Refer to paragraph 3-7 to determine which optics are exposed during maintenance. INITIAL SETUP Tools Maintenance platform
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
4-20.  Strap  Assembly,  Chin Attachment   Points   TM    1-8415-216-12&P c. Strap assembly, chin. INITIAL     SETUP Tools/Equipment Screwdriver
http://aviationandaccessories.tpub.com/TM-1-5855-265-20/css/TM-1-5855-...
3-5.  CORROSION INHIBITIVE SEALING AND COATING COMPOUND REMOVAL, APPLICATION, AND CURING INITIAL SETUP Tools Aircraft armament
http://aviationandaccessories.tpub.com/TM-5-6630-218-10/css/TM-5-6630-...
quick way to check fuel and is recommended for an initial check of the
http://aviationandaccessories.tpub.com/TM-43-0106/css/TM-43-0106_27.ht...
be allowed to stabilize at the potential test temperature.  The initial survey shall be made
http://aviationandaccessories.tpub.com/TM-55-4920-429-13/css/TM-55-492...
c.  Shutdown  Procedure Custom Search      Table 2-2. Test Set Initial Switch Positions TM-55-4920-429-13 Aviation Intermediate Maintenance
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
Manual c. Strap assembly, chin.   TM   1-8415-216-12&P b. Lining, helmet, shock (TPL)/cloth. INITIAL   SETUP Tools/Equipment Shears
http://aviationandaccessories.tpub.com/TM-1-8415-215-12P/css/TM-1-8415...
Manual 3-16.  ANVIS Goggles (attachment).   TM 1-8415-215-12&P 3-15.  ANVIS Mount Installation. INITIAL SETUP TABLE TOOLS MATERIALS
http://aviationandaccessories.tpub.com/TM-55-4920-243-35P/css/TM-55-49...
allowance   column.   Items   autho- rized for use as required, but not for initial stock- age  are  identified
http://aviationandaccessories.tpub.com/TM-55-1680-317-23P/css/TM-55-16...
23&P CHAPTER 2 MAINTENANCE INSTRUCTIONS Section I.  SERVICE UPON RECEIPT OF MATERIAL 2 - 1 .   INITIAL RECEIPT Each  survivor  kit
http://aviationandaccessories.tpub.com/TM-43-0106/css/TM-43-0106_15.ht...
condition of iron carbide resulting from a spheroidizing treatment.  The initial structure may be either
http://aviationandaccessories.tpub.com/TM-55-1510-222-10/css/TM-55-151...
nacelle  tank  to  be  consumed  by  the  engine  during  the initial  portion  of  the
http://aviationandaccessories.tpub.com/TM-55-1730-201-12/css/TM-55-173...
the  allowance  column.  Items authorized   for   use   as   required   but   not   for   initial   stockage   are   identified   with
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P
Section Vi. Painting And Marking Painting Procedure-Continued Painting Procedure-Continued Marking Procedures Marking Initial Setup Inspection Installation Retention
http://aviationandaccessories.tpub.com/TM-10-8415-206-12P/index.htm
Section Vi. Painting And Marking Painting Procedure-Continued Painting Procedure-Continued Marking Procedures Marking Initial Setup Inspection Installation Retention
http://aviationandaccessories.tpub.com/TM-55-1510-222-10/css/TM-55-151...
The  cargo  door  opening  is  52.0  inches wide  by  52.0  inches  high.    After  initial  opening  force  is applied
http://aviationandaccessories.tpub.com/TM-43-0106/css/TM-43-0106_25.ht...
deteriorated and of doubtful condition should be replaced. 2-51.  The initial and succeeding
http://aviationandaccessories.tpub.com/TM-55-1510-222-10/css/TM-55-151...
valve, causing it to move forward.  When the Beta valve reaches  its  initial  position,  oil  flow  to
http://aviationandaccessories.tpub.com/TM-1-1510-223-10/css/TM-1-1510-...
celle tank to be consumed by the engine during the initial portion of the
http://aviationandaccessories.tpub.com/TM-55-1510-220-10/css/TM-55-151...
nacelle  tank  to  be  consumed  by  the  engine  during  the initial  portion  of  the
http://aviationandaccessories.tpub.com/TM-55-4920-403-20P/css/TM-55-49...
other  components  of the  shop  set.  These  components  will  normally  be received  on  initial  shipment  in  boxes
http://aviationandaccessories.tpub.com/TM-1-8415-216-12P/css/TM-1-8415...
Procedure. 4-11 .a Fitting Procedure for the HGU-56/P. INITIAL SETUP Materials/Parts HGU
http://aviationandaccessories.tpub.com/TM-55-4920-429-13/css/TM-55-492...
scaling  of  all  input  signals  to  less  than  one- fourth of initial amplitude. With the
http://aviationandaccessories.tpub.com/TM-55-1510-219-10/css/TM-55-151...
nacelle  tank  to  be  consumed  by  the  engine  during  the initial  portion  of  the
http://aviationandaccessories.tpub.com/TM-55-1510-222-10/css/TM-55-151...
lever   to   the   Beta   valve   of   the governor.    The  initial  forward  motion  of
http://aviationandaccessories.tpub.com/TM-55-1510-221-10/css/TM-55-151...
nacelle  tank  to  be consumed by the engine during the initial portion of the
http://aviationandaccessories.tpub.com/TM-55-1510-220-10/css/TM-55-151...
at the top, provides cabin access for loading cargo or bulky items.    After  initial  opening  force  is  applied